The Three Stages Of Pipeline Construction

Wet utility pipeline construction is an enormous undertaking that is broken down into three stages. These include pre-construction organizing, active construction, and post-construction. Each stage calls for working with highly trained technical engineers, general contractors, project supervisors, and construction laborers.

The planning phase of pipeline construction is focused on the formation of design plans developed by civil engineers. In order to create blueprints, engineers need to acquire detailed facts about the worksite.

This is accomplished by employing subsurface utility engineering (SUE) businesses that survey the site using high-tech devices. SUE methods are designed for creating 3D images that discover objects buried underground, such as water pipes or utility systems.

Subsurface utility engineering innovations are very valuable to everyone associated with the project. Having the ability to identify the position of previously installed pipeline let contractors carry out their job more safely and proficiently, as well as decrease project costs.

A number of factors have to be looked at during the pre-construction preparation phase. One of the more essential is determining which sort of pipes is needed to effectively carry water while minimizing impact to the environment.

The active construction phase is a three-part process. The initial phase revolves around clearing the worksite of debris and grading the land. Trucks bring in pipes and construction materials so employees can begin the trenching process.

After pipeline is positioned into trenches it undergoes a series of tests to ensure the pipes do not have any leaks and that structural integrity has not been affected.

Numerous inspections are executed throughout the active construction period. Inspectors evaluate contractors’ licenses, construction permits, and insurance policies and make certain workers are properly trained in construction safety policies.

The post-construction stage pertains to restoring the terrain by back-filling trenches, landscaping the area, and removing waste materials. Additional inspections are performed to make certain pipes are working at greatest capacity and to validate structural integrity.

It is suggested to work with experienced wet utility construction contractors that are skilled in the type of work involved. Find contractors that have an impeccable construction safety record and are in good standing with the EPA.

Continue reading about water, sewer, and storm water pipeline construction at the Kana Pipeline website. Since 1984, Kana has supplied wet utility construction services to southern California. We are experienced in storm drain systems, fireline, and water and sewer pipelines. Learn more about our company at http://www.KanaPipeline.com.